Project Owner... |
VVBGC AB
|
Project name |
Vaexjoe Vaernamo Biomass Gasification Center AB
|
Status |
idle
|
Startup |
1995
|
Country |
Sweden
|
Street |
Energivägen 1
|
City |
Värnamo
|
ZIP |
33153
|
Type |
TRL 6-7 Demonstration
|
Technology |
PVC2: Power and Heat via Gasification
|
Raw Material |
lignocellulosics
|
Input 1 |
woody biomass, agrowaste
|
Output 1 |
power (electricity) (6 MWel )
|
Output 2 |
heat (8 MWth)
|
Output 3 |
clean syngas (1,000 m3/h)
|
Partners |
Foster Wheeler, E.ON for CHP
|
Technology Brief |
The plant was originally built for CHP production based on an IGCC concept. Fuel was fed by means of a lock hopper system. The gasifier was an airblown CFB operating at approx 20 atm.
Downstream of the gasifier and its associated cyclone, the gas was cooled to 400 C and then passed a hot gas filter in which particulateds were removed. The gas was then directly routed to either the flare or an SGT100 gas trubine.
Bleed air from the gas turbione compressor was used in the gasifier after pressure boosting. The exhaust gas from the turbine passed a HRSG generating steam at 45 bar 450 C and also some district heating before being released to the stack.
The steam was used in a steam turbine, after which there was a district heating condenser. The plant was operated in this way until 2000 when it was mothballed.
There has been several attempts to revive the plant for use as a steam-oxygen blown unit for synthesis gas production. The last attempt failed in 2011 for lack of industrial financing.
|
Additional Information |
www.vvbgc.se
|
Gunnar Crona
email: info@vvbgc.se
+46 370 69 41 00
|
Last Update: 2018-07-03 10:19:33